注册 | 登录 | 返回跨国采购网 | 查看公众询盘 | 帮助
欢迎 付款 收款 商家工具 竞拍工具
按行业浏览

国际询盘

 
     
 
109634.[RU] 俄罗斯求购锅炉(Boilers)

 
 
Requirements to Suppler.


�      Turn key project implementation

�      Experience in turn-key boiler equipment installation (please send us reference list and timing for realization of similar equipment);

�      Have all necessary licenses and permissions for performing such activities in EU or CIS (incl. Russia).



Requirements to boiler equipment.

�         Boiler should be fueled by degasification methane with concentration 30-96%. Calculation should be performed for 150-250 cub. m./h of pure methane (500-900 cub m./h of gas mixture).

�         Temperature graphic of hot water 70-95  

�         Noxious agent concentration of the exhaust gas from boiler chimney to atmosphere should meet the sanitary code demands.

�         Running regime automatic boiler-plant (without operating personal) with possibility to transfer data to PC.

�         Boiler plant should be fulfilled in modular implementation and should comprise:

- Gas treatment equipment;

- Burner equipment with automatic methane feeding regulation;

- Pumping equipment and pipeworks;

- Electric power supply equipment and panels;

- instrumentation and automated control systems;

- thermal insulation inside the container.


Delivery DDU (Kemerovo, Russia) Incoterms 2000.

Installation works include: assembling of modular boiler plant, installation of instrumentation and automated control systems and its check-out works, commissioning work.
本信息价值 5 点积分,建议回复日期 2007-10-23 之前.

 

如果您是本网VIP会员,请登录后查看联系方式。



忘了密码?

新用户请注册! 只需几分钟的时间。

相关信息
人才招聘
关键词: a b c d e f g h i j k l m n o p q r s t u v w x y z
按国家: a b c d e f g h i j k l m n o p q r s t u v w x y z
 

关于我们 | 买家资源 | 成功故事 | 积分制度 | 付费标准 | 服务承诺 | 付款方式